Results from projects led by the Fan-Div team, in the customers' own words. Includes work by our team at Motion Industries Canada and Vibe.FX, so the year is shown on every result.

Jump to: Cooling and airflow · Noise and inlet bells · Field support

Cooling and airflow

The only unit Ops could keep running at 35°C

Cofimco fan blade upgrade. Shell expected the gains would let them drop plans to replace the coolers.

“In the 35 C weather yesterday, looks like the upgraded unit was the only one Ops could keep running… I am guessing that the improvements are going to be enough that we can rule out future plans to replace our units.”

David Bailey, P.Eng., Facilities Engineer, Brownfield Projects, Shell CanadaBC · 2021 · Nick Agius, consulting

Running above 30°C for the first time

Five fans across two trains converted from Moore to Cofimco, with inlet bells, tip seals and new longer fan rings.

“Our run time in hot weather is much better.”

Rod Whelen, Obsidian Energy2018 · Our team at Motion Industries Canada

Outlet gas 20 to 24°C cooler

Belt drive upgrade, installed by our field crew.

“We have seen an outlet gas temp reduction of somewhere between 20-24 C lower than it was previous to this upgrade work being conducted.”

Quinton North, TC Energy (TCPL)Acme compressor station, AB · 2018 · Our team at Motion Industries Canada

No production cuts at 34°C

16 fans converted from low efficiency Moore to high efficiency Cofimco-Hudson, tip speed raised from 8,000 to 10,000 fpm, timing belts, inlet bells and DG-II Anti Rotation Devices®. About 50% more airflow projected from the existing horsepower, backed by HTRI runs. Before the upgrade the plant cut production at 30 to 31°C.

“We did not have to cut production as the fans did their job this time.”

Randy Peterson, Plant Maintenance Planner, Husky Energy (now Cenovus)Tucker Lake SAGD, AB · 2018 · Our team at Motion Industries Canada

Duty up from 3 to 4 to about 7 MMBtu/h

New fans plus internal and external bundle cleaning, on a cooler designed for 5.2 MMBtu/h.

“Now with the new fans and the cleanings both internally and externally, we were getting around 7 in the warmer fall weather!! Big improvement.”

Carolyn Butler, ShellSarnia, cooler CC-704, ON · 2017 · Our team at Motion Industries Canada

Approach temperature down 5°C

Air cooler fan upgrade. Discharge temperature rose only 5°C through a 10°C rise in ambient.

“Our approach temp is down 5deg from prior to the upgrade, and our final discharge temp is up only 5deg in the last month, despite the 10deg increase in ambient.”

Paul Emberton, Operations Specialist, CDU Production Engineering, Repsol Oil & Gas Canada (formerly Talisman)Wild River, K-101, AB · 2017 · Our team at Motion Industries Canada

Enough extra cooling to lock out more fans for the rebuild

After only 4 of 22 fans were upgraded, operations reported enough added cooling capacity to lock out more than one fan at a time for the rest of the rebuild.

Devon EnergyJackfish 2, AB · 2017 · Our team at Motion Industries Canada

$2 to 4 million a year in economic profit

Site visits and performance data, fan modelling and airflow improvements. A fouling problem was diagnosed and a cleaning specialist brought in.

“We implemented solutions to improve our fan performance and increase production resulting in an economic profit of $2-4 million/year.”

Darcy Broen, Polyethylene Train 2 Technical Advisor, Dow Chemical CanadaFort Saskatchewan Polyethylene, AB · c. 2016 · Our team at Motion Industries Canada

$1.56 million in value in under four months

Fan capacity upgrade on the SM column coolers, backed by Nick's airflow testing. Value measured May to mid August 2016.

“Believe the numbers below are, if anything, understating the value… Excellent work, thank Nick Agius for me please.”

Stephen Huber, NOVA ChemicalsJoffre, AB · 2016 · Our team at Motion Industries Canada

+19% cooling duty

Bundle cleaning, higher fan speed, a blade tip change and a tip seal.

“Yes it is +19% cooling duty. A real home run for this cooler.”

Kristen McGlone, E.I.T., Maintenance, Dow Chemical CanadaFort Saskatchewan, cooler E206, AB · 2016 · Our team at Motion Industries Canada

Full capacity through the summer heat

Two new fans for process and engine cooling, with a 3 to 4 degree improvement.

“We saw a significant change (3-4 degree change) with the new fans. These new fans allowed our operations team to run our units a full capacity in the heat of the summer.”

Lance McKinnon, Sr Facilities Engineer, TAQA North2016 · Our team at Motion Industries Canada

Noticeable improvement on four coolers

New Cofimco and Hudson fans, inlet bells, tip seals, poly chain belt drives, upsized shafts and bearings, anti-rotation devices and structural repairs.

“Overall the work was much needed and I am certain we are realizing benefits.”

Philip Nearing, P.Eng., Sr Process Engineer, Husky Energy (now Cenovus)Prince George Refinery, BC · 2016 · Our team at Motion Industries Canada

Flare reduction worth about $270,000 a year

Manual pitch adjustment devices repaired, air side bundle cleaning, pitch adjustment and fan replacement, and the tower adjusted to its new operating pressure. Later, poly chain belts and a fixed hub upgrade.

“All the changes contributed to a flare reduction estimated at $270K/year.”

Andrew Cameron, Continuous Improvement Specialist, Imperial OilStrathcona Refinery, AB · Our team at Motion Industries Canada

$250,000 more throughput every summer

Hudson B blades upgraded to the Hudson HC series: 6°C better on 12 fans and 4°C on two more.

“This translates into a $250,000 more throughput for Scotford on our CCR each and every summer from this point forward.”

Matt Pickard, ShellScotford Refinery, AB · 2009 · Our team at Motion Industries Canada

Up to 50% more airflow, and much lower vibration

An installer partner's report of a retrofit to Nick Agius's MOC package. The shaft, sheaves, belts and motor were reused; only the fan changed and a tip seal was added. Airflow was up to 50% higher than the original Moore fan.

Brandon Wever, Millwright and Owner, Wever, installer partnera SAGD site · Installer partner report

Noise and inlet bells

Better cooling, and bells ordered for more fans

Inlet bells on cooler 5E18.

“The inlet bells we installed fit up really well and we have noticed an improvement on cooling. We would like to install these on two other fans in our plant.”

Mark Melnyk, Cavvy EnergyJP Gas Plant · 2025 · Our team at Vibe.FX

Quieter, and more air from the same motors

Howden ultra low noise fan upgrade on a 1960s cooler. On one bay the old 12" fan ring was cut out and a 24" ring welded in so a 10 ft fan could replace the 9 ft. Also inlet bells, timing belts and DG-II Anti Rotation Devices®.

“On a positive note, the resident nearest the plant noticed a huge difference in noise once we fired back up last September after the turnaround… Nice to know it's having a positive effect on the people in the surrounding area.”

Scott Myrden, P.Eng., Plant Engineer, Cenovus EnergyElmworth Gas Plant, AB · 2024 · Our team at Vibe.FX

2 to 4°C better summer approach temperatures

New fans, inlet bells and tip sealing.

“Our trending indicates we got between 2C and 4C improvement on our approach temperatures in summer. So this was a win for us.”

Stephen Waters, Cenovus EnergyFoster Creek, AB · 2014 to 2015 · Our team at Motion Industries Canada

Field support

An obsolete fan troubleshot, then three fan packages ordered

Troubleshooting on an old fan that is no longer made, followed by an order for three replacement fan packages.

“I truly appreciate the support you've both provided. Your assistance has been invaluable.”

Seyi Ayedero, Reliability Engineering Group, Irving OilSaint John Refinery, NB · 2025 · Our team at Vibe.FX

Fans sorted ahead of a planned outage

Phoenix fans brought back into shape before the site's outage.

“Thank you for all the support… getting our Phoenix fans sorted out leading into the outage. You've been a tremendous ally over the years.”

Joe Kincaid, P.Eng., Team Leader, Mechanical Reliability, Petro-Canada LubricantsMississauga, ON · 2025 · Our team at Vibe.FX

A field crew praised for efficiency and professionalism

Field crew support on site.

“I wanted to reach out and let you know how happy I was with your team and the support they provided for us last week. I was impressed with how efficient and professional the guys were and will definitely be recommending your support in the future.”

Scott Keyowski, RSE, Lead Technician, Rotating Equipment Reliability, Federated Co-operatives, Co-op Refinery ComplexRegina, SK · 2025 · Our team at Vibe.FX

Repeat upgrade work for TC Energy

Another cooler fan upgrade on TC Energy's NGTL system, following the Acme station upgrade.

“Please pass on a 'Thank you, and Job well done!' to Mariusz and all the crew that executed another successful upgrade.”

Lyle Nowicki, Operations Specialist, NGTL Reliability, TC EnergyWolf Lake A3, NGTL, AB · 2024 · Our team at Vibe.FX

Solutions, every time

Ongoing air cooler and fan support from Nick Agius.

“Every single time I've run into an issue, you've had solutions… I will take any call from anyone regarding your capabilities and mission to help people fix their problems.”

Cliff Merritt, P.Eng., Thermal Facilities Engineer, Canadian Natural2021 · Nick Agius, consulting